Follow us :

Deformed Steel Bar for Construction

Deformed Steel Bar for Construction
Deformed Steel Bar for ConstructionDeformed Steel Bar for ConstructionDeformed Steel Bar for ConstructionDeformed Steel Bar for ConstructionDeformed Steel Bar for Construction
FOB Price

US $500.00100 - 200 ton

group name
Deformed Steel Bar
Min Order
100 ton
brand name
SINO EAST
Nearest port for product export
Tianjin Port
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, DDP, DDU
Acceptable payment methods
T/T, L/C, D/P D/A, Credit Card, Westem Union, Cash
update time
Wed, 24 Sep 2014 11:47:05 GMT

Paramtents

  • Place or original Tianjin

  • certificates sgs

  • Package By requirement

  • Coating by requirement

  • Usage Convey gas, water, oil

Packging & Delivery

  • Min Order100 ton

Briefing

Deformed Steel Bar for Construction
1.Length: 6m-12m
2.best competitive price,
3.customized specifications,

Detailed

Deformed steel bar for construction

1)Standard:ASTM,BS,GB  and other 2)Grade: HRB335,HRB400 3)Diameter(mm): 12,16,20,25,32mm

Standard:            ASTM,BS,GB and  other                                       
Grade:HRB335,HRB400
Diameter(mm):12,14,16,18,20,22.25
Length:9m--12m as standard
Application:mainly used in construction industry to reinforce concrete structures and so on
Price Term:FOB
Package:standard export packing or as per customer's requirement
Delivery  Time:15--30 days after receiving the L/C or pre-paid

rebar steel Diameter: 6mm-32mm etc. Material: HRB335, HRB400 Standard: ASTM, BS, EN

rebar steel

more types' steel rebar with good quality can be provided, please contact us

Type: Steel rebar

Diameter: 8mm-40mm etc.

Tensile Strength: According to the customer request

Material: HRB335, HRB400, BS4449 and more

Grade: Low carbon, middle carbon, high carbon.

Standard: ASTM, BS, EN, DIN, DA, and so on.

Application: fasteners for machine and bolts and screws for machine and so on

Packing: standard export packing, factory packing (pack in plastic spool, reel, bag or as

per customers' requirement)

Quality: First quality, the goods are from chinese big manufacturers.

Delivery time: A.S.A.P, within 5 days after receiving the prepayment

Others:  1. all the production process are made under the ISO 9001:2001 strictly

             2. our products conform to all the standards

             3. we can offer special specification products as per our customers

             4. we can offer the original mill test certificate and original production